Question cGS4GS2

What are the professional challenges likely to be faced by Ramesh and his response to overcome such challenges?

Open scan (p.30)

Introduction

Professional challenges faced by Ramesh and their response to overcome them:

11 words

Main Body

A) Options available: (1) Carrying on with project as per the plan Merit: Personal career humanism, Political rewriting Demerits: Established law of life in former, At cost of safety (2) Halt the project seeing the wrong during preparation Merit: Fulfill commitment & public welfare, Moral ethical governance Demerits: Delay leading to lost overrun (3) Holding mean HKITKA by consultation with object matte & finding adequate solution within time can repair Merit: Will address the ethical dilemma Demerits: Political neutralization may disappear B) Professional challenges for Ramesh: (1) Insuring Awareness of responsibility towards guider public welfare (2) Temperance & Courage & cut against political pressure (3) Supervisors going ahead of professional duty to heed to personal ethical value This will address the dilemmas and will be a twofold karma in line with Buddhist's ethic principles.

134 words1 paragraphs

Conclusion

Ramesh will need to balance professional responsibility with ethical values while maintaining integrity in the face of political pressure.

19 words

This is a continuation from previous page

Topper

SUNAWARDEEP SINGH MASOUN

AIR 762025

Subject & Paper

GS4GS2

Topic

Ethics

Professional Ethics

Professional Challenges in Project Management

Writing Stats

164

Total words

1

Paragraphs

prescriptive-analytical

Tone

Linked PYQ

An elevated corridor is being constructed to reduce traffic congestion in the capital of a particular state. You have been selected as project manager of this prestigious project on your professional competence and experience. The deadline is to complete the project in the next two years by 30 June 2021, since the project is to be inaugurated by the Chief Minister before the elections are announced in the second week of July 2021. While carrying out the surprise inspection by the inspecting team, a minor crack was noticed in one of the piers of the elevated corridor possibly due to poor material used. You immediately informed the chief engineer and stopped further work. It was assessed by you that a minimum of three piers of the elevated corridor have to be demolished and reconstructed. But this process will delay the project minimum by four to six months. But the chief engineer overruled the observation of the inspecting team on the ground that it was a minor crack that will not in any way impact the strength and durability of the bridge. He ordered you to overlook the observation of the inspecting team and continue working with the same speed and tempo. He informed you that the minister does not want any delay as he wants the Chief Minister to inaugurate the elevated corridor before the elections are declared. Also informed you that the contractor is a far relative of the minister and he wants him to finish the project. He also gave you a hint that your further promotion as an additional chief engineer is under consideration by the ministry. However, you strongly felt that the minor crack in the pier in the elevated corridor will adversely affect the health and life of the bridge and therefore it will be very dangerous not to repair the elevated corridor. (a) Under the given conditions, what are the options available to you as a project manager? (b) What are the ethical dilemmas being faced by the project manager and his response to overcome such challenges? (c) What are the professional challenges likely to be faced by the project manager and his response to overcome such challenges? (d) What can be the consequences of overlooking the observation raised by the inspecting team?

20M2021Explain