Question Q.7(a)GS4GS2

Under the given conditions, what are the options available to Ramesh as a project manager?

Open scan (p.29)

Main Body

1Allow the project to carry on - jeopardize safety of scoliandies, increased accidents, P his promotion is safe, project is completed on time, political benef happy. (2) Halt the project → Review G.A.D - asset delay, DEMERIT MERIT → professional integrity, safety maintained. (3) Mediate with PWD Minister - minister on job, draw unnecessary attention, DEMERIT MERIT → safety maintained, career intact.
63 words1 paragraphs

Diagram

Three circular DEMERIT-MERIT comparison diagrams showing options: (1) Allow project to carry on with merits and demerits, (2) Halt project and review GAD with merits and demerits, (3) Mediate with PWD Minister with merits and demerits

This is a continuation from previous page

Topper

LIZA GARGA

AIR 3032025

Subject & Paper

GS4GS2

Topic

Role of Civil Services in a Democracy

Professional Responsibilities and Accountability

Options for Public Officials in Ethical Dilemmas

Writing Stats

63

Total words

1

Paragraphs

analytical with diagrams

Tone

Linked PYQ

An elevated corridor is being constructed to reduce traffic congestion in the capital of a particular state. You have been selected as project manager of this prestigious project on your professional competence and experience. The deadline is to complete the project in the next two years by 30 June 2021, since the project is to be inaugurated by the Chief Minister before the elections are announced in the second week of July 2021. While carrying out the surprise inspection by the inspecting team, a minor crack was noticed in one of the piers of the elevated corridor possibly due to poor material used. You immediately informed the chief engineer and stopped further work. It was assessed by you that a minimum of three piers of the elevated corridor have to be demolished and reconstructed. But this process will delay the project minimum by four to six months. But the chief engineer overruled the observation of the inspecting team on the ground that it was a minor crack that will not in any way impact the strength and durability of the bridge. He ordered you to overlook the observation of the inspecting team and continue working with the same speed and tempo. He informed you that the minister does not want any delay as he wants the Chief Minister to inaugurate the elevated corridor before the elections are declared. Also informed you that the contractor is a far relative of the minister and he wants him to finish the project. He also gave you a hint that your further promotion as an additional chief engineer is under consideration by the ministry. However, you strongly felt that the minor crack in the pier in the elevated corridor will adversely affect the health and life of the bridge and therefore it will be very dangerous not to repair the elevated corridor. (a) Under the given conditions, what are the options available to you as a project manager? (b) What are the ethical dilemmas being faced by the project manager and his response to overcome such challenges? (c) What are the professional challenges likely to be faced by the project manager and his response to overcome such challenges? (d) What can be the consequences of overlooking the observation raised by the inspecting team?

20M2021Explain